Level of Development (LOD) describes how much detail and reliability a BIM element carries at a given stage of a project. Asking for the wrong level is one of the most common ways BIM budgets and schedules go off track: too low and the model cannot support permitting or coordination, too high and you pay for detail nobody uses. This guide explains each level in plain terms.

What LOD means

LOD is a specification of how developed a model element is and how far the team can rely on it. The commonly used scale comes from the BIMForum Level of Development Specification and runs from LOD 100 to LOD 500, with LOD 350 added between 300 and 400. Always write the required level into the contract or BIM execution plan, element by element if needed, rather than asking for “LOD 300 everywhere”.

The levels at a glance

  • LOD 100. Concept. Massing, area and rough volume. Useful for feasibility, early cost checks and zoning studies.
  • LOD 200. Schematic. Generic elements with approximate size, shape, location and orientation. Good for design development and early coordination.
  • LOD 300. Detailed design. Elements are modeled with accurate size, shape, location and quantity. This is the usual level for permit and construction documents.
  • LOD 350. Coordination. Adds the interfaces between systems, such as supports and connections, so clash detection between disciplines is meaningful.
  • LOD 400. Fabrication. Enough detail for shop drawings and fabrication or assembly by the trade.
  • LOD 500. As-built. Field-verified model representing what was actually installed, used for facility management and handover.

How to choose the right level

  • Feasibility or pricing a site: LOD 100 to 200 is usually enough.
  • Permit set and construction documents: LOD 300 for architecture, structure and MEP.
  • Multi-trade coordination before construction: LOD 350, with clash detection run on the federated model.
  • Prefabrication or shop drawings: LOD 400 for the elements being fabricated only.
  • Handover and operations: LOD 500, or an as-built model built from a laser scan.

Common mistakes

  • Requesting a single LOD for the whole model instead of by element and by phase.
  • Confusing LOD (geometry and reliability) with level of information. Data such as manufacturer and fire rating needs its own requirement.
  • Asking for LOD 400 across the building when only a few trades need it.
  • Not defining who owns each element at each stage, which leads to duplicated or missing modeling.

Related services

We build Revit models from LOD 100 to LOD 500 for US projects. See our BIM and engineering services, or read how BIM works and how it compares in BIM vs CAD. If you are renovating an existing building, a point cloud to BIM model gives you an accurate as-built starting point.

Frequently asked questions

What is the difference between LOD 300 and LOD 350?

LOD 300 models elements with accurate size, shape, location and quantity. LOD 350 adds the connections and interfaces with other systems, which makes clash detection between disciplines reliable.

Which LOD is needed for a building permit?

Permit and construction documents are typically produced from a LOD 300 model, but requirements vary by jurisdiction and project, so confirm with your plan reviewer and project team.

Is a higher LOD always better?

No. Higher levels cost more time and money. Choose the lowest level that supports the decisions and deliverables at each stage.

What does LOD 500 mean?

LOD 500 is a field-verified, as-built model that reflects what was actually installed, mainly used for facility management and handover.

Need help on a project? DesignTech Global provides architecture, BIM and drafting support for US architects, contractors and developers, with a free 48-hour pilot. Request a quote.

1 thought on “BIM LOD 100 to 500 Explained: Which Level of Development Do You Need?”

  1. Pingback: As-Built Drawings From Laser Scans: A Clear Guide

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top